Canada Data Center Market - Investment Analysis & Growth Opportunities 2024-2029

141 pages

14 tables

25 charts

1 region

1 countries

67 company

7 segments

Purchase Options

$2990.00
$3500.00
$4500.00
$2000.00

Have a question?

Please get in touch with our team in case of any queries

+1-312-235-2040

THE CANADA DATA CENTER MARKET SIZE WAS VALUED AT USD 5.03 BILLION IN 2023 AND IS EXPECTED TO REACH USD 9.04 BILLION BY 2029, GROWING AT A CAGR OF 10.26% DURING THE FORECAST PERIOD.

The Canada Data Center Market Report Includes Size in Terms of

  • IT Infrastructure: Servers, Storage Systems, and Network Infrastructure
  • Electrical Infrastructure: UPS Systems, Generators, Transfer Switches & Switchgears, PDUs, and Other Electrical Infrastructure
  • Mechanical Infrastructure: Cooling Systems, Rack Cabinets, and Other Mechanical Infrastructure
  • Cooling Systems: CRAC & CRAH Units, Chiller Units, Cooling Towers, Condensers & Dry Coolers, Economizers & Evaporative Coolers, and Other Cooling Units
  • General Construction: Core & Shell Development, Installation & Commissioning Services, Engineering & Building Design, Fire Detection & Suppression Systems, Physical Security, and DCIM
  • Tier Standard: Tier I & Tier II, Tier III, and Tier IV
  • Geography: Toronto, Montreal, and Other Cities

Get Insights on 117 Existing Data Centers and 13 Upcoming Facilities across Canada

Customize this Report

This report includes market data points, ranging from trend
analyses to market estimates & forecasts that you can customize

CANADA DATA CENTER MARKET REPORT SCOPE

REPORT ATTRIBUTEDETAILS
MARKET SIZE (INVESTMENT)USD 9.04 Billion (2029)
MARKET SIZE (AREA)1.68 million sq. Feet (2029)
MARKET SIZE (POWER CAPACITY)292 MW (2029)
CAGR INVESTMENT (2023-2029)10.26%
COLOCATION MARKET SIZE (REVENUE)USD 1.85 Billion (2029)
HISTORIC YEAR2020-2022
BASE YEAR2023
FORECAST YEAR2024-2029
Interested in this Report?

Download a Sample!

MARKET INSIGHTS

The Canada data center market size will witness investments of USD 9.04 billion by 2029, growing at a CAGR of 10.26% during the forecast period. Furthermore, the region is also witnessing growth in connectivity with submarine cables connecting major locations. Around five submarine cables are under development and are expected to be operational during the forecast period.

The Canada data center market presents a compelling landscape shaped by robust infrastructure, government support, and strategic positioning. This abstract overviews key factors driving the market’s growth, including increasing demand for cloud services and data storage. Major hubs like Toronto and Montreal are hotspots for major investments in this tech space. Furthermore, the increasing investment in renewable energy, from solar and wind energy to power data centers, is a major attraction for Canada's industry players. For instance, STACK Infrastructure launched its first facility in Toronto, Canada, powered by 100% renewable energy.

The low electricity pricing, abundant renewable energy, free cooling solutions, availability of tax incentives, and improved connectivity with the U.S. and other countries make the Canada data center market attractive to investors. Furthermore, QScale, a new company, announced its plan to build at least three facilities in Quebec City powered by renewable energy and focused on AI. The facilities are expected to be online during the forecast period. 

KEY HIGHLIGHTS

  • Canada has around 117 operational colocation data centers. Most colocation data centers are being developed according to Tier III standards. The Canada data center market has the presence of some local and global operators such as Cologix, Equinix, Digital Realty, eStruxture Data Centers, Urbacon Data Centre Solutions, and Vantage Data Centers, among others.
  • The increase in the adoption of cloud-based services in the country is growing the establishment of cloud regions by major cloud services providers such as Microsoft, Oracle, Google, Amazon Web Services, and Tencent Cloud.
  • Increasing investments in prime locations such as Montreal and Toronto will lead to an increase in land prices. Such factors may propel operators to shift their focus to emerging locations such as Calgary, Quebec City, and others during the forecast period.
  • The hyperscale self-built investment by Microsoft and AWS will likely increase the power capacity in the Canada data center market during the forecast period.
  • The deployment of 5G networks will boost the region's digital economy and lead to a higher demand for high-bandwidth networking infrastructure. The adoption of Software Defined Networking (SDN) is likely to increase owing to smart city initiatives carried out by government agencies. 

WHY SHOULD YOU BUY THIS RESEARCH?

  • Market size available in the investment, area, power capacity, and Canada colocation market revenue.
  • An assessment of the data center investment in Canada by colocation, hyperscale, and enterprise operators.
  • Investments in the area (square feet) and power capacity (MW) across cities in the country.
  • A detailed study of the existing Canada data center market landscape, an in-depth industry analysis, and insightful predictions about market size during the forecast period.
  • Snapshot of existing and upcoming third-party data center facilities in Canada
    • Facilities Covered (Existing): 117
    • Facilities Identified (Upcoming): 13
    • Coverage: 22 Cities
    • Existing vs. Upcoming (Area)
    • Existing vs. Upcoming (IT Load Capacity)
  • Data Center Colocation Market in Canada
    • Colocation Market Revenue & Forecast (2023-2029)
    • Wholesale vs. Retail Colocation Revenue (2023-2029)
    • Retail Colocation Pricing
    • Wholesale Colocation Pricing
  • The Canada data center market investments are classified into IT, power, cooling, and general construction services with sizing and forecast.
  • A comprehensive analysis of the latest trends, growth rate, potential opportunities, growth restraints, and prospects for the market.
  • Business overview and product offerings of prominent IT infrastructure providers, construction contractors, support infrastructure providers, and investors operating in the market.
  • A transparent research methodology and the analysis of the demand and supply aspects of the market.

VENDOR LANDSCAPE

  • Some of the key investors in the Canada data center market are Equinix, Cologix, Digital Realty, STACK Infrastructure, Vantage Data Centers, eStruxture Data Centers, Microsoft, AWS, Urbacon Data Centre Solutions, OVHcloud, QScale and others.
  • In December 2023, AWS announced the launch of its new AWS Canada West (Calgary) Region, with three Availability Zones (AZs). The company plans to invest around USD 18 billion towards expanding Canada's West and Central regions by 2037.
  • In November 2023, Microsoft plans to establish several new data centers in Quebec City by investing USD 500 million in expanding its cloud computing and AI infrastructure over the next two years.
  • Several global companies are entering the Canada data center market by acquiring facilities. For instance, in June 2023, KDDI (Telehouse) entered the market by acquiring Allied Properties REIT with an investment of over USD 1 billion.
  • The existing colocation operators are also involved in expanding their existing portfolio. For instance, Equinix, Cologix, eStruxture Data Centers, Urbacon Data Centre Solutions, and others are developing several new facilities in the Canada data center market.

EXISTING VS. UPCOMING DATA CENTERS

  • Existing Facilities in the Region (Area and Power Capacity)
    • Montreal
    • Toronto
    • Other Cities
  • List of Upcoming Facilities in the region (Area and Power Capacity)
    • Montreal
    • Toronto
    • Other Cities

REPORT COVERAGE:

This report analyses the Canada data center market share. It elaboratively analyses the existing and upcoming facilities and investments in IT, electrical, mechanical infrastructure, general construction, and tier standards. It discusses market sizing and investment estimation for different segments. The segmentation includes:

  • IT Infrastructure
    • Servers
    • Storage Systems
    • Network Infrastructure
  • Electrical Infrastructure
    • UPS Systems
    • Generators
    • Transfer Switches & Switchgears
    • PDUs
    • Other Electrical Infrastructure
  • Mechanical Infrastructure
    • Cooling Systems
    • Rack Cabinets
    • Other Mechanical Infrastructure
  • Cooling Systems
    • CRAC & CRAH Units
    • Chiller Units
    • Cooling Towers, Condensers & Dry Coolers
    • Economizers & Evaporative Coolers
    • Other Cooling Units
  • General Construction
    • Core & Shell Development
    • Installation & Commissioning Services
    • Engineering & Building Design
    • Fire Detection & Suppression Systems
    • Physical Security
    • Data Center Infrastructure Management (DCIM)
  • Tier Standard
    • Tier I & Tier II
    • Tier III
    • Tier IV
  • Geography
    • Toronto
    • Montreal
    • Other Cities

VENDOR LANDSCAPE

  • IT Infrastructure Providers: Arista Networks, Atos, Broadcom, Cisco Systems, Dell Technologies, Hewlett Packard Enterprise, Huawei Technologies, IBM, Juniper Networks, Lenovo, NetApp, Oracle.
  • Data Center Construction Contractors & Sub-Contractors: Arup, AECOM, Black & Veatch, Computer Room Services Corporation (CRSC), DPR Construction, Ehvert, EllisDon, First Gulf, Karbon Engineering, PCL Construction, Salute Mission Critical, Turner Construction, Urbacon, and WZMH Architects.
  • Support Infrastructure Providers: ABB, Alfa Laval, Arctic Chiller Group, Caterpillar, Chatsworth Products, ClimateWorx, Cummins, CoolIT Systems, Dataprobe, Delta Electronics, Eaton, Generac Power Systems, Johnson Controls, KyotoCooling, Legrand, Mitsubishi Electric, Panduit, Piller Power Systems, Rittal, Rolls-Royce, Schneider Electric, STULZ, Siemens, Toshiba, Trane, Vertiv.
  • Data Center Investors: Amazon Web Services (AWS), Cologix, Compass Datacenters, Digital Realty, Equinix, eStruxture Data Centers, Google, Microsoft, OVHcloud, STACK Infrastructure, Urbacon Data Centre Solutions and Vantage Data Centers.
  • New Entrants: Gatineau Data Hub (GDH), QScale, Telehouse.

Frequently Asked Questions

How big is the Canada data center market?

The Canada data center market will witness investments of USD 9.04 billion by 2029.

How many existing and upcoming data center facilities exist in Canada?

There are around 117 existing facilities and 13 upcoming data center facilities in Canada.

What is the growth rate of the Canada data center market?

The Canada data center market is projected to grow at a CAGR of 10.26% during the forecast period.

How much MW of power capacity will be added across Canada during 2024-2029?

Over 1,400 MW of power capacity will be added across Canada between 2024 and 2029.

What factors are driving the Canada data center market?

The adoption of cloud infrastructure, growth in inland cable and fiber connectivity, rising recognition of big data and IoT, and increase in data center activities such as M&A and JV will drive the Canada data center market.

Who are the key investors in the Canada data center market?

The key investors in the Canada data center market include Equinix, Digital Realty, Cologix, QScale, Vantage Data Centers, eStruxture Data Centers, Urbacon Data Centre Solutions, STACK Infrastructure, and others.

The Canada data center market size is projected to reach USD 9.04 billion by 2029, growing at a CAGR of 10.26% from 2023 to 2029.

The following factors are likely to contribute to the growth of the Canada data center market during the forecast period:

  • Improvements in Inland & Submarine Connectivity
  • Increasing Cloud Service Adoption
  • Increase in Data Center Investments & Activities
  • Big Data & IoT Driving Data Center Investments

Base Year: 2023

Forecast Year: 2024-2029

The report considers the present scenario of the Canada data center market and its market dynamics for 2024-2029. It covers a detailed overview of several market growth enablers, restraints, and trends. The study includes the demand and supply aspects of the market. 

The report includes the investment in the following areas:

  • IT Infrastructure
    • Servers
    • Storage Systems
    • Network Infrastructure
  • Electrical Infrastructure
    • UPS Systems
    • Generators
    • Transfer Switches & Switchgears
    • PDUs
    • Other Electrical Infrastructure
  • Mechanical Infrastructure
    • Cooling Systems
    • Rack Cabinets
    • Other Mechanical Infrastructure
  • Cooling Systems
    • CRAC & CRAH Units
    • Chiller Units
    • Cooling Towers, Condensers & Dry Coolers
    • Economizers & Evaporative Coolers
    • Other Cooling Units
  • General Construction
    • Core & Shell Development
    • Installation & Commissioning Services
    • Engineering & Building Design
    • Fire Detection & Suppression Systems
    • Physical Security
    • Data Center Infrastructure Management (DCIM)
  • Tier Standard
    • Tier I & Tier II
    • Tier III
    • Tier IV
  • Geography
    • Toronto
    • Montreal
    • Other Cities

VENDOR LANDSCAPE

IT Infrastructure Providers

  • Arista Networks
  • Atos
  • Broadcom
  • Cisco Systems
  • Dell Technologies
  • Hewlett Packard Enterprise
  • Huawei Technologies
  • IBM
  • Juniper Networks
  • Lenovo
  • NetApp
  • Oracle

Data Center Construction Contractors & Sub-Contractors

  • Arup
  • AECOM
  • Black & Veatch
  • Computer Room Services Corporation (CRSC)
  • DPR Construction
  • Ehvert
  • EllisDon
  • First Gulf
  • Karbon Engineering
  • PCL Construction
  • Salute Mission Critical
  • Turner Construction
  • Urbacon
  • WZMH Architects

Support Infrastructure Providers

  • ABB
  • Alfa Laval
  • Arctic Chiller Group
  • Caterpillar
  • Chatsworth Products
  • ClimateWorx
  • Cummins
  • CoolIT Systems
  • Dataprobe
  • Delta Electronics
  • Eaton
  • Generac Power Systems
  • Johnson Controls
  • KyotoCooling
  • Legrand
  • Mitsubishi Electric
  • Panduit
  • Piller Power Systems
  • Rittal
  • Rolls-Royce
  • Schneider Electric
  • STULZ
  • Siemens
  • Toshiba
  • Trane
  • Vertiv

Data Center Investors

  • Amazon Web Services (AWS)
  • Cologix
  • Compass Datacenters
  • Digital Realty
  • Equinix
  • eStruxture Data Centers
  • Google
  • Microsoft
  • OVHcloud
  • STACK Infrastructure
  • Urbacon Data Centre Solutions
  • Vantage Data Centers

New Entrants

  • Gatineau Data Hub (GDH)
  • Qscale
  • Telehouse

Exhibit 1 Third-Party Data Centers Snapshot
Exhibit 2 Third-Party Data Center Snapshot by Cities
Exhibit 3 Area Developed by Cities (Thousand Square Feet)
Exhibit 4 Power Capacity by Cities (MW)
Exhibit 5 Data Center Market Size & Forecast by Investment 2020-2029 ($ Billion)
Exhibit 6 Data Center Market Size & Forecast by Area 2020−2029 (Thousand Square Feet)
Exhibit 7 Data Center Market Size & Forecast by Power Capacity 2020−2029 (MW)
Exhibit 8 Data Center Colocation Service Revenue: Market Size & Forecast by 2020−2029 ($ Million)
Exhibit 9 Retail vs. Wholesale Colocation Revenue: Market Size & Forecast by 2020−2029 ($ Million)
Exhibit 10 Retail & Wholesale Colocation Pricing 2023
Exhibit 11 Market Size & Forecast by IT Infrastructure 2020−2029 ($ Billion)
Exhibit 12 Market Size & Forecast by Electrical Infrastructure 2020−2029 ($ Million)
Exhibit 13 Market Size & Forecast by Mechanical Infrastructure 2020−2029 ($ Million)
Exhibit 14 Market Size & Forecast by Cooling Systems 2020−2029 ($ Million)
Exhibit 15 Market Size & Forecast by General Construction 2020−2029 ($ Million)
Exhibit 16 Market Size & Forecast by Tier Standards 2020−2029 ($ Million)
Exhibit 17 Market Size & Forecast in Montreal by Investment 2020-2029 ($ Million)
Exhibit 18 Market Size & Forecast in Montreal by Area 2020−2029 (Thousand Square Feet)
Exhibit 19 Market Size & Forecast in Montreal by Power Capacity 2020−2029 (MW)
Exhibit 20 Market Size & Forecast in Toronto by Investment 2020-2029 ($ Million)
Exhibit 21 Market Size & Forecast in Toronto by Area 2020−2029 (Thousand Square Feet)
Exhibit 22 Market Size & Forecast in Toronto by Power Capacity 2020−2029 (MW)
Exhibit 23 Market Size & Forecast in Other Cities by Investment 2020-2029 ($ Million)
Exhibit 24 Market Size & Forecast in Other Cities by Area 2020−2029 (Thousand Square Feet)
Exhibit 25 Market Size & Forecast in Other Cities by Power Capacity 2020−2029 (MW)

LIST OF TABLES

Table 1 List of Upcoming Data Center Projects
Table 2 Data Center Site Selection Criteria
Table 3 Overall Market Size & Forecast 2020−2029
Table 4 Market Size & Forecast by Colocation Service Type 2020-2029 ($ Million)
Table 5 Market Size & Forecast by Infrastructure 2020−2029 ($ Billion)
Table 6 Market Size & Forecast by IT Infrastructure 2020−2029 ($ Billion)
Table 7 Market Size & Forecast by Electrical Infrastructure 2020−2029 ($ Million)
Table 8 Market Size & Forecast by Mechanical Infrastructure 2020−2029 ($ Million)
Table 9 Market Size & Forecast by Cooling Systems 2020−2029 ($ Million)
Table 10 Market Size & Forecast by General Construction 2020−2029 ($ Million)
Table 11 Market Size & Forecast by Tier Standards 2020−2029 ($ Million)
Table 12 Overall Market Size & Forecast in Montreal 2020−2029
Table 13 Overall Market Size & Forecast in Toronto 2020−2029
Table 14 Overall Market Size & Forecast in Other Cities 2020−2029

  1. Existing & Upcoming Third-Party Data Centers in Canada
    • Historical Market Scenario
    • 117+ Unique Data Center Properties
    • Data Center IT Load Capacity
    • Data Center White Floor Area
    • Existing Vs Upcoming Data Center Capacity by Cities
    • Cities Covered
      • Montreal
      • Toronto
      • Other Cities
    • List of Upcoming Data Center Projects
  2. Investment Opportunities in Canada
    • Microeconomic and Macroeconomic factors of Canada Market
    • Investment Opportunities in Canada
    • Digital Data in Canada
    • Investment by Area
    • Investment by Power Capacity
  3. Data Center Colocation Market in Canada
    • Demand Across Several Industries in Canada
    • Colocation Services Market in Canada
    • Retail Vs Wholesale Data Center Colocation
    • Colocation Pricing (Quarter Rack, Half Rack, Full Rack) & Add-on
  4. Market Dynamics
    • Market Drivers
    • Market Trends
    • Market Restraints
  5. Market Segmentation
    • IT Infrastructure: Market Size & Forecast
    • Electrical Infrastructure: Market Size & Forecast
    • Mechanical Infrastructure: Market Size & Forecast
    • General Construction Services: Market Size & Forecast
  6. Tier Standards Investment
    • Tier I & II
    • Tier III
    • Tier IV
  7. Geography
    • Montreal
    • Toronto
    • Other Cities
  8. Key Market Participants
    • IT Infrastructure Providers
    • Construction Contractors
    • Support Infrastructure Providers
    • Data Center Investors
    • New Entrants
  9. Appendix
    • Market Derivation
    • Site Selection Criteria
    • Quantitative Summary

Select a license type that suits your business needs

Single User Licence

$2990.00
  • Report accessible by one user only
  • Free 10% or 3 days of customization
  • Free post-sale service assistance
  • Continuous support through email

5 User Licence

$3500.00
  • Report accessible by 5 users within the organization
  • Free 15% or 4.5 days of customization
  • Continuous support through email and telephone
  • Free analyst hour
  • Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge

Corporate Licence

$4500.00
  • Free Datasheet worth $1500
  • Report accessible by the entire organization
  • Free 20% or 6 days of customization
  • Free post-sale service assistance
  • Continuous support through email and telephone
  • Direct access to lead analysts
  • Free analyst hour
  • Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge

Datasheet Licence

$2000.00
  • Report accessible by 1 user only
  • Free 15% or 32 hours of customization
  • Free post-sale service assistance
  • Direct access to lead analysts

Frequently Asked Questions

How big is the Canada data center market?

The Canada data center market will witness investments of USD 9.04 billion by 2029.

How many existing and upcoming data center facilities exist in Canada?

There are around 117 existing facilities and 13 upcoming data center facilities in Canada.

What is the growth rate of the Canada data center market?

The Canada data center market is projected to grow at a CAGR of 10.26% during the forecast period.

How much MW of power capacity will be added across Canada during 2024-2029?

Over 1,400 MW of power capacity will be added across Canada between 2024 and 2029.

What factors are driving the Canada data center market?

The adoption of cloud infrastructure, growth in inland cable and fiber connectivity, rising recognition of big data and IoT, and increase in data center activities such as M&A and JV will drive the Canada data center market.

Who are the key investors in the Canada data center market?

The key investors in the Canada data center market include Equinix, Digital Realty, Cologix, QScale, Vantage Data Centers, eStruxture Data Centers, Urbacon Data Centre Solutions, STACK Infrastructure, and others.