Middle East & Africa Sustainable Data Center Market Landscape 2026-2031

THE MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET SIZE WAS VALUED AT USD 2.03 BILLION IN 2025 AND IS EXPECTED TO REACH USD 11.87 BILLION BY 2031, GROWING AT A CAGR OF 34.24%.

The Middle East & Africa Sustainable Data Center Market Research Report Includes Size, Share, and Growth in Terms of

  1. Infrastructure: Electrical Infrastructure, Mechanical Infrastructure, and General Construction
  2. Geography: Middle East (UAE, Saudi Arabia, Israel, Turkey, Other Middle Eastern Countries) and Africa (South Africa, Kenya, Nigeria and Other African Countries)

Industry Analysis Report, Regional Outlook, Growth Potential, Price Trends, Competitive Market Share & Forecast 2026–2031.

Customize this Report

This report includes market data points, ranging from trend
analyses to market estimates & forecasts that you can customize

MIDDLE EAST AND AFRICA GREEN DATA CENTER MARKET REPORT SCOPE

REPORT ATTRIBUTEDETAILS
MARKET SIZE BY INVESTMENT 2031USD 11.87 Billion
MARKET SIZE BY INVESTMENT 2025USD 2.03 Billion
CAGR - INVESTMENT (2025-2031)34.24%
POWER CAPACITY (2031)939.5 MW
BASE YEAR2021
FORECAST YEAR2026-2031
MARKET SEGMENTSInfrastructure and Geography
GEOGRAPHICAL ANALYSISMiddle East (UAE, Saudi Arabia, Israel, Turkey, Other Middle Eastern Countries) and Africa (South Africa, Kenya, Nigeria and Other African Countries)
Interested in this Report?

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET SIZE

The Middle East & Africa sustainable data center market size was valued at USD 2.03 billion in 2025 and is expected to reach USD 11.87 billion by 2031, growing at a CAGR of 34.24% during the forecast period. The market is undergoing a significant transformation as sustainability becomes a core priority alongside digital infrastructure expansion.

The growing footprint of hyperscale cloud companies is among the key catalysts for sustainable data center investments, driving capital toward facilities that incorporate low-carbon construction materials, renewable power, liquid cooling technologies, and high energy-efficiency standards to align with corporate net-zero goals. For example, in November 2025, Google Cloud signed a deal for a $3 billion hyperscale data center in Ankara, under a partnership with Turkcell.

Data center operators across the Middle East & Africa region are increasingly utilizing green loans, sustainability-linked financing, and green bonds to fund large-scale expansion projects. For instance, in September 2025, iXAfrica Data Centres secured financing from Rand Merchant Bank to expand its NBOX1 data center in Nairobi by 20MW. The expansion will increase the facility’s total capacity to 22.5 MW as part of the company’s broader investment to scale colocation infrastructure in the country.

Policy support and industry collaboration are strengthening the transition toward sustainable data center development across Africa. For example, the Africa Data Centres Association (ADCA) is the trade association representing Africa’s data center industry. It brings together data center operators, suppliers, investors, and other stakeholders to promote industry growth, share knowledge, and strengthen the sector’s engagement with governments and policymakers.

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET INSIGHTS BY POWER CAPACITY

The Middle East & Africa sustainable data center market by power capacity is expected to reach 939.5 MW by 2031. Rising electricity demand and grid constraints are shaping sustainable data center power investments across the Middle East & Africa, as AI adoption and digitalization increase power requirements while grid congestion, lengthy connection queues, and limited transmission capacity restrict expansion in markets such as the UAE, South Africa, Saudi Arabia, and Kenya. These challenges are increasing the importance of securing reliable, long-term power supplies and investing in supporting energy infrastructure.

Long-term renewable energy agreements are supporting new clean power capacity alongside Middle East & Africa’s data center expansion. Operators are partnering with energy providers to secure electricity from wind, solar, and hydropower projects, improve long-term power supply visibility, and meet decarbonization targets. For example, in July 2025, ACWA Power signed 25-year PPAs worth SAR 22.5 billion ($6 billion) with Saudi Power Procurement Company for five large solar PV projects totaling 12GW in Saudi Arabia.

Battery Energy Storage Systems (BESS) are emerging as a critical investment area in MEA's data center power infrastructure, enabling renewable energy integration, grid stability, and reliable backup power. For example, in October 2025, AAAS Energy and ChillMine signed an MoU to develop a data center campus near Palapye, linked to an energy hub and industrial park. The associated energy development includes a 250-MW solar PV project and a planned BESS of approximately 100MW/400MWh.

KEY TAKEAWAYS

  1. By Infrastructure: The general construction accounted for the largest Middle East & Africa sustainable data center market share of around 38% in 2025.
  2. By Electrical Infrastructure: The Middle East & Africa sustainable data center electrical infrastructure market is expected to grow at a CAGR of 33.37% during the forecast period.

RECENT DEVELOPMENTS & NEWS IN MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET

  1. In September 2026, Microsoft announced an additional $2 billion+ pledge, scaling its total regional commitment to over $10 billion through 2030 across Saudi Arabia, the UAE, Qatar, and Kuwait.
  2. In April 2026, Pure Data Centres announced the expansion of its Abu Dhabi AUH01 campus from 41MW to 48MW and stated that it had matched 100% of the facility's 2025 electricity consumption with I-RECs sourced from solar PV generation at the Mohammed bin Rashid Al Maktoum Solar Park.
  3. In 2026, the UAE Ministry of Energy and Infrastructure, Khazna Data Centers, and Agility announced a pilot using Phaidra's AI technology to optimize power, cooling, and workload-management systems across data centers. The system is intended to improve tokens-per-watt efficiency, increase IT capacity, and improve resilience in high-temperature environments.
  4. In February 2025, Teraco, a Digital Realty company, signed a wind-power PPA with South African renewable-energy aggregator NOA to supply its data centers. The agreement complements Teraco's 120 MW solar PV plant under construction in the Free State.

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET KEY TRENDS

Shift Toward Liquid and Water-Efficient Cooling Technologies

The extreme water stress across the GCC is pushing data center developers toward cooling architectures that reduce or eliminate evaporative water consumption. This is particularly important in the UAE, Saudi Arabia, Qatar, Kuwait, Bahrain, and Oman, where ambient temperatures can exceed 40° Celsius for prolonged periods and conventional cooling-tower systems can create substantial water demand.

In August 2025, Teraco completed a 30MW expansion of its JB4 campus in Johannesburg, taking the facility to 50MW of critical IT load. The new data halls are fully liquid-to-liquid cooling-enabled and support direct-to-chip cooling for high-density AI workloads. It also introduced a closed-loop chilled-water system with free-air cooling, allowing the facility to operate with zero water consumption during ongoing cooling.

ICS Arabia and UAE/UK-based XDS announced a 10-MW immersion-cooled data center in Riyadh, with Desert Dragon Data Centers responsible for design and construction and XDS operating the facility for 15 years. The project was scheduled for handover in June 2026. Unlike direct-to-chip systems, the facility uses immersion cooling, in which computing equipment is immersed in a specialized cooling fluid.

Innovations in Data Center Power Technologies

The MEA sustainable data center market is witnessing rapid innovation in power infrastructure as rising digitalization, cloud adoption, AI workloads, and increasing data center capacity place greater demands on reliable and sustainable electricity supply.

Pure Data Centres’ Yas Island data center in Abu Dhabi became operational in February 2025. Its electrical infrastructure includes UPS systems, switchgear, and HVO-powered backup generators. The facility replaced conventional diesel dependence with a lower-carbon alternative fuel.

In the UAE, Khazna Data Centers has adopted HVO-based fuel for its backup generators, with Al Masaood Power supplying MTU Series 4000 generator systems capable of operating on HVO.

Africa Data Centres deployed Eaton's Power Xpert 9395P UPS with Li-ion battery combinations as part of a modular power-infrastructure upgrade in Midrand, Johannesburg. The system was designed to address South Africa's power disturbances and load-shedding conditions while reducing the footprint and maintenance requirements of the backup system.

MEEZA's M-Vault data center at Qatar Science & Technology Park was built to hyperscale specifications and went live in December 2021. The facility is equipped with Liebert EXL S1 UPS systems with Li-ion batteries

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET DRIVERS

Rapid Growth in AI & Cloud Computing

AI and cloud computing growth is accelerating sustainable data center investment across the Middle East & Africa, as operators expand capacity to support high-density workloads while integrating renewable energy, advanced cooling, and energy-efficient infrastructure. For example, in December 2025, AWS launched the AWS AI Factory offering, which enables organizations to run advanced AI hardware, including NVIDIA GPUs, networking and storage systems, and Trainium chips directly in the data centers of organizations. AWS aims to offer organizations faster, secure, and scalable AI technologies without solely relying on the cloud.

Middle East & African data center developers are increasingly combining high-density computing infrastructure with low-carbon cooling and renewable power solutions. Projects are leveraging liquid cooling, naturally cool climates, seawater cooling, and waste-heat recovery to improve efficiency and reduce environmental impact. For instance, in October 2025, Mega DC and Nebius launched their data center for processing AI in the Modi’in data center facility. It is the largest AI computing facility in Israel, 25% of which is estimated to be allocated to the Israel Innovation Authority for the operation of the national supercomputer. The center, which provides AI processing using 8 MW of power, contains 4,000 NVIDIA graphics processors costing about $300 million.

In March 2025, Cassava Technologies announced plans to deploy an NVIDIA-powered AI supercomputer in South Africa as part of Africa’s first AI factory. The initiative aims to accelerate AI innovation and expand advanced digital infrastructure across the continent.

Corporate Net-Zero and ESG Commitments

Corporate net-zero commitments and sustainability frameworks are shaping data center investment across the Middle East & Africa, encouraging operators to integrate renewable electricity, energy-efficient cooling, water conservation, waste-heat recovery, and circular construction into new and existing facilities.

Equinix has strengthened its clean energy strategy through 29 PPAs across 12 countries, covering more than 1,400MW of renewable energy capacity. In 2025, operational PPAs reached 854MW, a 186% YoY increase, supporting higher renewable energy coverage across its global data center portfolio. It also targets improving operational efficiency by achieving a global PUE of 1.33 by 2030.

NTT DATA has strengthened its corporate net-zero commitment through the “NTT DATA NET-ZERO Vision 2040,” targeting net-zero GHG emissions across its value chain by 2040. The company aims to achieve net-zero emissions for data centers by 2030, extend this commitment across its offices and facilities by 2035, and reduce emissions by 90% or more by 2040 in line with its SBTi-approved targets.

Data center operators are extending decarbonization efforts beyond operational electricity consumption to construction materials and residual emissions. Companies are adopting lower-carbon building materials, improving resource efficiency, and investing in carbon removal to reduce their overall environmental footprint. For instance, Khazna Data Centers replaced diesel generators in its UAE data center facilities with biofuel-powered generators since 2023 to reduce environmental impact and lower the carbon emissions generated by data centers; this helps align with the broader goals of the country to achieve carbon neutrality by 2050.

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET RESTRAINTS

Rising Carbon Emissions from Data Centers

Rapid adoption of AI and cloud computing is driving unprecedented growth in data center capacity, significantly increasing electricity demand worldwide. As a result, data centers currently account for approximately 180 million tonnes of indirect CO₂ emissions from electricity consumption globally, according to the International Energy Agency (IEA). Global data center electricity demand is projected to more than double to around 945TWh by 2030, increasing pressure on power grids and decarbonization efforts.

Without sufficient renewable energy deployment, the IEA projects that CO₂ emissions from electricity used by data centers could increase to around 320 million tonnes by 2030.

Natural gas is often viewed as a lower-carbon alternative to coal and oil, but it remains a fossil fuel. Several Middle Eastern electricity systems continue to depend heavily on natural gas. For example, the 2026 GCC analysis identifies natural gas as the dominant generation source in Saudi Arabia, UAE, Qatar, Bahrain, and Oman.

The GCC’s grid carbon intensity remains relatively high. A 2026 study estimates the GCC average lifecycle electricity carbon intensity at 624 gCO₂e/kWh, compared with a global average of 440 gCO₂e/kWh.

The UAE has a comparatively lower grid carbon intensity than several other GCC markets because of its nuclear and renewable generation, but the rapid expansion of data centers is still increasing the amount of electricity that must be decarbonized. UAE data centers consumed around 3TWh of electricity in 2025, approximately 2% of national electricity demand, and the consumption is expected to exceed 6TWh by 2030.

Water Scarcity Impacting Data Center Operations

Data centers across the globe are facing intense pressure on critical resources, including electricity, water, land, and grid infrastructure. As AI workloads and digital demand continue to grow, resource scarcity is emerging as a key sustainability challenge, requiring operators to adopt more efficient infrastructure planning and resource management practices.

Cape Town data center expansion faces direct opposition over water consumption. In May 2026, advocacy groups formally challenged plans associated with Equinix for two large Cape Town data centers, citing inadequate disclosure of their water requirements, electricity consumption, emissions, and other environmental impacts. Water is particularly sensitive because Cape Town came close to “Day Zero” during its 2017–2018 drought.

By September 2026, South African civil-rights organizations were calling for a temporary halt to rapid data center development amid concerns over water, electricity, and land use. More than 250 submissions had reportedly been received by the South African Human Rights Commission on resource and transparency concerns.

In July 2026, Israel's Ministry of Agriculture reported significant water shortages resulting from drought and reduced water allocations. National agricultural freshwater allocations were reduced from approximately 380 million m cube in 2025 to 290 million m cube in 2026, while allocations around the Sea of Galilee fell from approximately 92 million m cube to 60 million m cube.

In September 2026, five of Israel's six desalination plants were temporarily shut down after microalgae affected the facilities. The disruption highlighted the country's heavy dependence on coastal desalination infrastructure.

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET SEGMENTATION INSIGHTS

INSIGHTS BY INFRASTRUCTURE

Based on the infrastructure, general construction accounted for the largest Middle East & Africa sustainable data center market share of around 38% in 2025. Data center construction includes both greenfield and brownfield development, with major construction contractors working alongside design and infrastructure providers and data center operators.

Facility design focuses on durability, scalability, operational flexibility, energy efficiency, and operational resilience. This creates opportunities for construction contractors, material suppliers, and infrastructure providers to support sustainable data center projects across the region.

The adoption of DCIM and BMS software is also helping data center operators reduce operating costs and carbon emissions through improved power usage management. In addition, colocation providers are increasingly integrating AI and ML technologies into data center management. These developments create opportunities for software providers and technology vendors to offer solutions that improve facility performance, energy efficiency, and operational management.

INSIGHTS BY ELECTRICAL INFRASTRUCTURE

The Middle East & Africa sustainable data center electrical infrastructure market is expected to grow at a CAGR of 33.37% during the forecast period. Data center operators across the region are increasingly adopting high-efficiency lithium-ion and modular UPS systems with intelligent energy management to reduce power losses, lower cooling requirements, and improve energy efficiency while meeting sustainability goals. This creates opportunities for UPS manufacturers and electrical infrastructure suppliers to target data center operators with energy-efficient power solutions.

Advanced UPS systems are also being integrated with battery energy storage systems (BESS) to support grid balancing, peak shaving, and greater use of renewable energy while reducing reliance on diesel backup power. In addition, several hyperscale operators are exploring hydrogen-ready generators and fuel cell technologies as long-term alternatives to conventional diesel backup systems. These developments create opportunities for power equipment manufacturers and technology providers to offer sustainable backup and energy storage solutions aligned with regional net-zero commitments.

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET GEOGRAPHICAL ANALYSIS

UAE

The UAE led Middle East & Africa’s sustainable data center investment market in 2025, attracting approximately $622 million in investment. This reflects strong demand for hyperscale and colocation capacity, alongside growing investment in energy-efficient infrastructure, renewable power integration, and sustainable cooling solutions to support the region’s expanding digital economy. The country’s digital transformation initiatives, growing IoT and big data adoption, and strong demand for digital services are attracting significant investment in sustainable data center infrastructure.

Saudi Arabia

Saudi Arabia’s extreme climate and limited freshwater resources make water-intensive cooling a major sustainability consideration. Emerging data center approaches include low-water cooling, closed-loop systems, and other technologies designed to reduce thermal-management water consumption. Its sustainable data center investment market is gaining momentum as hyperscalers, colocation providers, and domestic technology companies invest in large-scale, AI-ready facilities. The market is projected to reach $3,610.0 million by 2031, supported by growing demand for digital infrastructure and investments in waste-heat recovery, water-efficient cooling, renewable energy sourcing and energy-efficient facility design.

Israel

The data center market in Israel has expanded significantly over the past two decades, driven by the rising demand from hyperscale operators and digital infrastructure providers. The sector is attracting major sustainable infrastructure investments, supported by renewable energy initiatives such as the development of new solar projects to help power future facilities with cleaner energy.

Turkey

Turkey is positioning itself to attract international investments in sustainable hyperscale data centers by leveraging its abundant renewable energy resources, robust fiber connectivity, and stable operating environment to support the growing global AI computing demand. Equinix states that all of its data centers in Turkey are covered by 100% renewable energy. The market is expected to grow at a CAGR of 43.56% during the forecast period.

South Africa

South Africa’s rapid digital transformation, driven by affordable smartphones and widespread internet access, is accelerating the demand for data centers that provide secure, reliable, and scalable digital infrastructure. In October 2025, AAAS Energy and ChillMine signed an MoU to develop a data center campus near Palapye, linked to an energy hub and industrial park. The associated energy development includes a 250 MW solar PV project and a planned BESS of approximately 100 MW/400 MWh.

Kenya

Kenya is adopting innovative approaches to support sustainable data center growth, with investments spanning hydrogen-powered energy hubs, underwater cooling technologies, renewable energy projects, and energy storage systems. These initiatives are helping to create a cleaner and more resilient energy ecosystem that can support the country's expanding AI and digital infrastructure sectors. In August 2026, Greek energy company Amaco Energy Group proposed a $1.5 billion AI data center in Mombasa that would generate its own electricity from an offshore LNG-powered platform, rather than relying substantially on Kenya's national grid.

Nigeria

Nigeria's Energy Transition Plan targets universal electricity access and a pathway toward net-zero emissions by 2060, while requiring major expansion of renewable energy and energy efficiency. It launched a $500 million Distributed Renewable Energy Fund in 2025, while the government announced a planned $2 billion National Climate Change Fund and a $500 million Climate Investment Platform in 2026.

MIDDLE EAST & AFRICA SUSTAINABLE DATA CENTER MARKET VENDOR LANDSCAPE

Equinix, Digital Realty, Amazon Web Services (AWS), Google, Microsoft, EdgeConneX, Gulf Data Hub, Khazna Data Centers, MedOne, MEEZA, MEGA DC, Open Access Data Centres, Africa Data Centres, Rack Centre, and Vantage Data Centers are among the major operators investing billions of dollars in hyperscale, AI-ready, and sustainable data center infrastructure across the MEA region.

The Middle East & Africa sustainable data center market is increasingly supported by renewable energy developers and power providers, including AAAS Energy, ACWA Power, Al Nowais Investments, African Rainbow Energy (ARE), EDF Power Solutions, ENGIE, Masdar, NOA Group, SolarAfrica Energy, Yellow Door Energy (YDE), alongside other regional renewable energy companies. These providers are supporting data center expansion through long-term power purchase agreements (PPAs), self-generation partnerships, wind and solar projects, and dedicated renewable power supply in the Middle East & Africa markets.

SNAPSHOT

The Middle East & Africa sustainable data center market is projected to reach USD 11.87 billion by 2031, growing at a CAGR of 34.24% from 2025 to 2031.

The following factors are likely to contribute to the growth of the Middle East & Africa sustainable data center market during the forecast period:

  1. Rapid Growth of Cloud Computing, AI, and Digital Transformation
  2. Corporate Net-zero and ESG Commitments
  3. Abundant Solar and Wind Energy Potential Across MEA

Base Year: 2025

Forecast Year: 2026-2031

The report considers the present scenario of the Middle East & Africa sustainable data center market and its market dynamics for 2026−2031. It covers a detailed overview of several market growth enablers, restraints, and trends. The study includes the demand and supply aspects of the Middle East & Africa sustainable data center industry.

Segmentation by Infrastructure

  1. Electrical Infrastructure
  2. Mechanical Infrastructure
  3. General Construction

Segmentation by Geography

  1. UAE
  2. Saudi Arabia
  3. Israel
  4. Turkey
  5. Other Middle Eastern Countries
  6. South Africa
  7. Kenya
  8. Nigeria
  9. Other African countries

KEY DATA CENTER INVESTORS

  1. Amazon Web Services
  2. Africa Data Centres
  3. Batelco
  4. Bynet Data Communications
  5. Cloudoon
  6. center3
  7. DAMAC Digital
  8. Du
  9. DataVolt
  10. Desert Dragon Data Centers
  11. Digital Parks Africa
  12. Digital Realty
  13. EdgeConneX
  14. Equinix
  15. e& Egypt
  16. Google
  17. Gulf Data Hub
  18. G42
  19. HUMAIN
  20. iXAfrica Data Centres
  21. Kasi Cloud
  22. Khazna Data Centers
  23. MedOne
  24. MEEZA
  25. Mega Data Centers (MEGA DC)
  26. Microsoft
  27. Mobily
  28. Moro Hub
  29. MTN
  30. Nxtra by Airtel
  31. NGN
  32. NEOIX
  33. Open Access Data Centres
  34. Ooredoo
  35. Oracle
  36. Otech
  37. Orange Business
  38. Pure Data Centres
  39. Quantum Switch
  40. Rack Centre
  41. Sahayeb Data Centers
  42. Safaricom
  43. Telecom Egypt
  44. Türk Telekom
  45. Turkcell
  46. Telkom Kenya
  47. Vantage Data Centers

RENEWABLE ENERGY PROVIDERS

  1. AAAS Energy
  2. Anthem
  3. ACWA Power
  4. Alfanar Projects
  5. Al Nowais Investments
  6. Arnergy
  7. African Rainbow Energy
  8. Botala Energy
  9. DPA Southern Africa
  10. EDF Power Solutions
  11. ENGIE
  12. Masdar
  13. Kenon Holdings
  14. Noon Energy
  15. NOA Group
  16. NEOM
  17. Octopus Energy Group
  18. SolarAfrica Energy
  19. SoleCrypt
  20. Scatec
  21. TAQA
  22. Yellow Door Energy

MIDDLE EAST AND AFRICA GREEN DATA CENTER MARKET FAQs

How big is the Middle East & Africa sustainable data center market?

The Middle East & Africa sustainable data center market size witnessed investments of USD 2.03 billion in 2025 and will witness investments of USD 11.87 billion by 2031.

What is the estimated market size in terms of power capacity in the Middle East & Africa sustainable data center market by 2031?

Regarding power capacity, the MEA sustainable data center market is expected to reach 939.5 MW by 2031.

What are the key trends in the Middle East & Africa sustainable data center market?

Some of the key trends in the Middle East & Africa sustainable data center market include rising renewable energy integration, sustainable innovations in data center power technology, and advanced data center cooling technologies.

For more details, please reach us at [email protected]

For more details, please reach us at [email protected]

Select a license type that suits your business needs

Single User Licence

$4500
  • Report accessible by one user only
  • Free 10% or 3 days of customization
  • Free post-sale service assistance
  • Continuous support through email

5 User Licence

$5000
  • Report accessible by 5 users within the organization
  • Free 15% or 4.5 days of customization
  • Continuous support through email and telephone
  • Free analyst hour
  • Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge

Corporate Licence

$6999
  • Free Datasheet worth $1500
  • Report accessible by the entire organization
  • Free 20% or 6 days of customization
  • Free post-sale service assistance
  • Continuous support through email and telephone
  • Direct access to lead analysts
  • Free analyst hour
  • Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge

Datasheet Licence

$2000
  • Report accessible by 1 user only
  • Free 15% or 32 hours of customization
  • Free post-sale service assistance
  • Direct access to lead analysts

Frequently Asked Questions

How big is the Middle East & Africa sustainable data center market?

The Middle East & Africa sustainable data center market size witnessed investments of USD 2.03 billion in 2025 and will witness investments of USD 11.87 billion by 2031.

What is the estimated market size in terms of power capacity in the Middle East & Africa sustainable data center market by 2031?

Regarding power capacity, the MEA sustainable data center market is expected to reach 939.5 MW by 2031.

What are the key trends in the Middle East & Africa sustainable data center market?

Some of the key trends in the Middle East & Africa sustainable data center market include rising renewable energy integration, sustainable innovations in data center power technology, and advanced data center cooling technologies.