THE DENMARK DATA CENTER MARKET SIZE WAS VALUED AT USD 1.95 BILLION IN 2025 AND IS EXPECTED TO REACH USD 3.19 BILLION BY 2031, GROWING AT A CAGR OF 8.52% DURING THE FORECAST PERIOD.

The Denmark Data Center Market Report Includes Size in Terms of

  1. IT Infrastructure: Servers, Storage Systems, and Network Infrastructure
  2. Electrical Infrastructure: UPS Systems, Generators, Transfer Switches & Switchgears, PDUs, and Other Electrical Infrastructure
  3. Mechanical Infrastructure: Cooling Systems, Rack Cabinets, and Other Mechanical Infrastructure
  4. Cooling Systems: CRAC & CRAH Units, Chiller Units, Cooling Towers, Condensers & Dry Coolers, and Other Cooling Units
  5. General Construction: Core & Shell Development, Installation & Commissioning Services, Engineering & Building Design, Fire Detection & Suppression Systems, Physical Security, and Data Center Infrastructure Management (DCIM)
  6. Tier Standard: Tier I & Tier II, Tier III, and Tier IV

Get Insights on 33 Existing Data Centers and 11 Upcoming Facilities across Denmark

Customize this Report

This report includes market data points, ranging from trend
analyses to market estimates & forecasts that you can customize

DENMARK DATA CENTER MARKET REPORT SCOPE

REPORT ATTRIBUTEDETAILS
MARKET SIZE (INVESTMENT)USD 3.19 Billion (2031)
MARKET SIZE (AREA)343 Thousand Sq. feet (2031)
MARKET SIZE (POWER CAPACITY)98 MW (2031)
CAGR - INVESTMENT (2025-2031)8.52%
COLOCATION MARKET SIZE (REVENUE)USD 590 Million (2031)
HISTORIC YEAR2022-2024
BASE YEAR2025
FORECAST YEAR2026-2031
Interested in this Report?

DENMARK DATA CENTER MARKET SIZE & OUTLOOK

The Denmark data center market was valued at USD 1.95 billion in 2025 and is projected to reach USD 3.19 billion by 2031, expanding at a CAGR of 8.52% during the forecast period. Denmark has earned the nickname “Land of Hyperscales” due to the high concentration of large-scale hyperscale data center campuses relative to its population and geographic size. Major global cloud and hyperscale providers have invested billions of dollars in data center facilities across the country, strengthening Denmark’s position as a key Nordic hub for large-scale digital infrastructure.

Denmark’s strong position as a data center destination is supported by its high share of renewable energy, advanced cooling solutions, political stability, robust power grid infrastructure, and availability of land for hyperscale developments. These advantages, combined with the country’s favorable business environment, make Denmark an attractive location for large-scale data center investments across Europe.

Demand for data centers in Denmark continues to increase, supported by the expansion of hyperscale and cloud infrastructure across the Nordic region. The growing adoption of artificial intelligence (AI), cloud migration, and digital transformation is further driving demand for high-capacity data center facilities. Denmark’s access to renewable energy, reliable power infrastructure, and extensive submarine cable connectivity also supports the development of sustainable and highly connected data center operations. Furthermore, government support, political stability, and favorable tax policies are strengthening investor confidence and encouraging further investment in the sector.

The Danish Data Center Industry (DDI) is a non-profit association representing Denmark’s broader data center ecosystem, including operators, suppliers, municipalities, utility companies, technology vendors, and other industry stakeholders. The organization was established to promote Denmark as an attractive destination for data center investment and to support the development of a sustainable digital infrastructure ecosystem.

Data center construction costs in Denmark remain relatively competitive within the Nordic region, averaging approximately USD 10–12 million per MW. This cost advantage makes Denmark comparatively less expensive for data center development than neighboring Nordic markets, including Sweden, Norway, and Finland, thereby supporting its attractiveness for large-scale projects.

The Danish government also supports the growth of the data center industry through tax incentives and regulatory measures. Initiatives such as the R&D Tax Reduction Scheme encourage data center companies to invest in technology development and operations within the country. In parallel, regulations such as the Danish Data Protection Act establish requirements for the secure storage and processing of data, helping strengthen Denmark’s position as a reliable and secure location for data center operations.

DENMARK DATA CENTER MARKET INSIGHTS BY AREA

The Denmark data center market by area is projected to reach approximately 343 thousand sq. ft. by 2031, supported by the continued expansion of data center infrastructure across key locations. Copenhagen remains the leading data center hub in Denmark, hosting the largest concentration of operational facilities. The city currently has around 17 active data centers, collectively providing approximately 233.6 thousand sq. ft. of white floor area.

Furthermore, around four additional facilities are under construction or in the announced stage, which are expected to contribute approximately 653.9 thousand sq. ft. of additional white floor area upon completion, further strengthening Copenhagen’s position as a major data center location in Denmark.

DENMARK DATA CENTER MARKET INSIGHTS BY POWER CAPACITY

The Denmark data center market by power capacity is projected to reach approximately 98 MW by 2031, driven by the country’s reliable and well-developed electricity infrastructure. The Danish Energy Agency, operating under the Ministry of Climate, Energy, and Utilities, oversees the power sector and establishes the country’s broader energy policies and regulatory framework.

Meanwhile, Energinet, Denmark’s state-owned Transmission System Operator (TSO), owns and operates the national electricity transmission grid and is responsible for maintaining grid stability and managing the country’s high-voltage transmission infrastructure.




Denmark Data Center Market – Investment Analysis & Growth Opportunities 2026-2031


LIST OF FACILITIES IN DENMARK

Denmark Data Center Landscape at a Glance

  1. Facilities Covered (Existing): 33
  2. Facilities Identified (Upcoming): 11
  3. Coverage: 14+ Locations
  4. Existing vs. Upcoming (Data Center Area)
  5. Existing vs. Upcoming (IT Load Capacity)

Data center colocation market in Denmark

  1. Colocation Market Revenue & Forecast (2022-2031)
  2. Retail & Wholesale Colocation Revenue (2022-2031)
  3. Retail & Wholesale Colocation Pricing

KEY TAKEAWAYS

  1. IT Infrastructure: The server infrastructure segment held the leading position in Denmark’s data center market in 2025, accounting for approximately 49% of the total market share.
  2. Electrical Infrastructure: The UPS segment emerged as the dominant component of Denmark’s data center electrical infrastructure market in 2025.
  3. Mechanical Infrastructure: Cooling systems accounted for the largest share of Denmark’ data center mechanical infrastructure market in 2025
  4. General Construction: The core & shell development segment accounted for approximately 44% of Denmark’ data center market in 2025, making it the leading general construction category.
  5. Tier Standard: Tier IV facilities represented the largest share of Denmark’ data center market by tier standard in 2025.
  6. Colocation: Retail colocation is the dominant segment of Denmark’s data center market.

DENMARK DATA CENTER MARKET RECENT DEVELOPMENT

  1. In February 2025, Denmark strengthened its focus on AI development by joining the newly established Coalition for Sustainable AI, announced during the AI Action Summit in Paris. The coalition brings together countries including France, Denmark, Norway, Germany, the UK, and Italy to promote responsible and sustainable AI development and deployment.
  2. In April 2025, the Danish Data Center Industry organized an international conference focused on exploring opportunities for the development of AI and cloud infrastructure, with discussions centered on strengthening the digital infrastructure required to support future AI and cloud-based operations.
  3. In May 2025, Denmark launched the National Centre for Artificial Intelligence in Society (CAISA), an initiative aimed at bringing together leading Danish AI researchers to advance AI research, collaboration, and development within the country.
  4. In October 2025, Kolo DC inaugurated its new DK5 data center in Copenhagen, located at Bimester 10. The state-of-the-art facility was developed to support AI-focused enterprises as well as conventional IT workloads, strengthening Copenhagen’s data center capacity and its ability to accommodate emerging high-performance computing requirements.
  5. In November 2025, atNorth signed an agreement to supply excess heat from its data center operations to a district heating network in Copenhagen. The initiative highlights the growing integration of data center infrastructure with Denmark’s district heating ecosystem and supports efforts to improve energy efficiency and reduce carbon emissions through heat reuse.
  6. In December 2025, Microsoft reported that it employed nearly 1,000 people in Denmark and collaborated with more than 3,500 Danish partners and start-ups. The company also pledged to help upskill one million Danes in AI competencies through the Danish AI Pact and announced a significant expansion of its quantum laboratory in Lyngby, further supporting Denmark’s AI and advanced technology ecosystem.

DENMARK DATA CENTER MARKET ENABLERS

Growth in Cloud-based Services

Cloud adoption is driving greater scalability, cost optimization, faster innovation, and enhanced cybersecurity, while supporting the growing use of AI, analytics, and digital transformation across industries. For instance, Danske Bank migrated thousands of servers and applications to AWS as part of its modernization initiatives, demonstrating the growing scale and strategic importance of cloud transformation in Denmark.

This shift is gaining momentum across various sectors, including finance, healthcare, manufacturing, and telecommunications, as organizations increasingly adopt cloud platforms to enhance scalability, improve data accessibility, and increase operational efficiency.

Innovation in Technology and Liquid Cooling

Technology innovation plays a critical role in the data center industry by enabling operators to meet the rapidly growing demand for AI and high-performance computing (HPC) workloads. The adoption of advanced technologies helps data centers improve energy efficiency, optimize power and cooling systems, reduce operational and infrastructure costs, and enhance overall performance.

At the same time, technological advancements support operators in addressing increasingly stringent sustainability, reliability, and resilience requirements, while enabling data centers to accommodate higher power densities and evolving computing requirements.

DENMARK DATA CENTER MARKET TRENDS

District Heating Integration

Recovering excess heat from data centers can significantly enhance overall energy efficiency by converting waste heat into usable thermal energy for residential and industrial applications. Rather than releasing excess heat into the atmosphere, data center operators can capture and redirect it to district heating networks and nearby facilities, reducing energy consumption and associated carbon emissions.

This approach supports Denmark’s broader decarbonization and energy efficiency objectives while enabling data center operators to improve their sustainability performance and contribute to the development of a more circular energy ecosystem.

Sustainability Measures Among Data Center Operators

Denmark is witnessing a steady increase in renewable energy procurement, driven by the country’s strong commitment to sustainability and its ongoing transition toward cleaner energy sources. The growing availability and adoption of wind and solar power are supporting the decarbonization of the electricity sector while reducing reliance on fossil fuels.

This shift is particularly relevant to the data center industry, where operators are increasingly securing renewable electricity through power purchase agreements and other procurement mechanisms to meet rising energy demand while lowering carbon emissions, improving environmental performance, and aligning operations with Denmark’s broader climate and sustainability targets.

DENMARK DATA CENTER MARKET RESTRAINTS

Skilled Workforce & Technical Talent Constraints

The growing number of data centers in Denmark is driving an increasing demand for skilled technicians, engineers, and other specialized professionals required to operate and maintain mission-critical facilities. However, the rapid expansion of data center and cloud infrastructure has outpaced the availability of qualified talent, while domestic education and vocational programs have traditionally placed limited emphasis on specialized data center and critical-facility skills, widening the existing talent gap.

The challenge is further compounded by Denmark’s aging workforce and limited pool of domestic technology professionals, making it increasingly difficult for data center operators to recruit and retain skilled employees. Furthermore, the migration of younger professionals toward higher-paying opportunities abroad is placing additional pressure on the country’s already constrained talent pool.

Supply Chain Disruptions Hampering Data Center Growth

Supply chain disruptions have become a key constraint on data center development in Denmark, impacting construction schedules, project execution, and overall operational efficiency. The Danish data center industry is particularly exposed to such disruptions due to its strong reliance on imported components and specialized infrastructure equipment, including servers, generators, transformers, HVAC systems, and advanced cooling solutions.

Procurement and delivery delays for these critical components can extend project timelines, increase construction and equipment costs, and create challenges for the timely completion, commissioning, and expansion of data center facilities across the country.

DENMARK DATA CENTER MARKET SEGMENTATION

INSIGHT BY IT INFRASTRUCTURE

Based on IT infrastructure, the server segment held the largest share of the Denmark data center market, accounting for approximately 49% in 2025. Its leading position is primarily attributed to the accelerating pace of digitalization across the country, which is driving demand for cloud-based services and robust, scalable server infrastructure. The information and communication sector remains at the forefront of cloud computing adoption in Denmark, while manufacturing, financial services, healthcare, and government organizations are also increasingly leveraging cloud technologies to support their digital operations.

Moreover, the increasing focus on digital transformation, growing enterprise and individual adoption of cloud computing, and continued 5G network deployment are expected to further drive demand for cloud servers across Denmark. As businesses increasingly shift applications, workloads, and data to cloud environments, the need for high-performance and scalable server infrastructure is expected to remain strong, reinforcing the server segment’s dominant position in the Denmark data center market.

INSIGHT BY ELECTRICAL INFRASTRUCTURE

Denmark’s data center electrical infrastructure market was led by the UPS segment in 2025, highlighting the increasing importance of reliable, resilient, and uninterrupted power supply for data center operations. The growing deployment of advanced UPS systems is particularly important as data centers accommodate increasingly critical and power-intensive workloads, including cloud computing, AI, and other digital applications.

This trend is also reflected in upcoming data center developments, such as Prime Data Centers' planned Sabey facility, which is expected to deploy UPS systems with an N+1 redundancy configuration. The use of redundant UPS infrastructure is expected to enhance power resilience, minimize the risk of service disruptions, and support continuous data center operations during power outages or equipment failures.

INSIGHT BY MECHANICAL INFRASTRUCTURE

Cooling systems accounted for the largest share of Denmark’s data center mechanical infrastructure in 2025, highlighting the growing importance of effective thermal management as IT workloads and power densities increase. The selection of cooling systems in data centers depends on several factors, including IT load, cooling capacity, installation and operating costs, energy efficiency, and future expansion requirements.

In Denmark, data center operators are adopting a combination of efficient and reliable cooling technologies to address increasing thermal management requirements. For example, atNorth’s DEN01 data center in Copenhagen utilizes chilled water-cooling systems and is also capable of leveraging free cooling, with an N+1 redundancy configuration to enhance cooling reliability, support continuous operations, and reduce the risk of service disruptions.

INSIGHT BY GENERAL CONSTRUCTION INFRASTRUCTURE

Core & shell construction was the largest segment within the general infrastructure category of Denmark’s data center market in 2025, accounting for approximately 44% of the overall market share. Its leading position is attributed to the continued development of data center facilities, where major construction contractors collaborate with design firms, infrastructure providers, and data center operators to develop purpose-built facilities capable of supporting increasing capacity and operational demands.

Additionally, core & shell construction costs in Denmark remain relatively competitive compared with several other European markets, partly driven by growing investments in hyperscale and modular data center facilities. The rising adoption of these data center models is promoting standardized construction approaches and greater development efficiency, enabling operators to optimize infrastructure costs while supporting the ongoing expansion of data center capacity across Denmark.

INSIGHT BY TIER STANDARD

Tier IV accounted for the largest share of Denmark’s data center market by tier standard in 2025, reflecting the growing demand for high availability, fault tolerance, operational resilience, and robust redundancy capabilities among data center operators. The increasing adoption of Tier IV infrastructure highlights the country’s focus on developing highly reliable facilities capable of maintaining continuous operations even in the event of equipment failures or planned maintenance.

Denmark’s expanding Tier IV infrastructure further reinforces this trend, with Region Nord Jylland’s Datacenter IT-Huset receiving Tier IV accreditation from the Uptime Institute for both its design documentation and completed facility. This accreditation demonstrates the facility’s compliance with stringent requirements for redundancy, fault tolerance, and overall infrastructure reliability.

INSIGHT BY COLOCATION

Retail colocation accounted for the largest share of the Denmark data center market in 2025, driven by the growing demand for scalable, flexible, and reliable data center capacity across multiple industries. The continued expansion of digitalization in Denmark is prompting data center operators to develop large-scale, high-MW campuses to address increasing demand from colocation providers, cloud platforms, and enterprise customers. Prime Data Centers, at North, and Thylander are developing data center campuses with capacities of 100 MW or more, demonstrating the increasing scale and importance of colocation infrastructure in the Danish market.

The development of these high-capacity campuses is being supported by the rising volume of digital workloads, cloud-based applications, and data-intensive operations that require substantial and dependable computing infrastructure. Organizations are increasingly turning to specialized data center operators to access scalable capacity while improving infrastructure efficiency, reliability, and cost management. Consequently, demand for retail colocation and large-scale colocation facilities is expected to remain strong throughout the forecast period.

DENMARK DATA CENTER MARKET VENDOR LANDSCAPE

In the current landscape of investors, several established companies play a significant role. Notable players include Bulk Infrastructure, Digital Realty, Global Connect, Kolo DC, Atlas Edge, Valtice Data Centers, and others.

The market has been actively witnessing several M&A activities among the data center operators. In February 2026, Equinix and the Canada Pension Plan Investment Board (CPP) announced their acquisition of atNorth in a deal valued at approximately $4.2 billion. According to the agreement, CPP is likely to own 60% of the company's shares, while Equinix is likely to hold the remaining 40%.

In December 2025, Microsoft announced its plan to establish a state-of-the-art data center region in West Jutland, featuring three locations in the Varde and Esbjerg municipalities. This double-digit billion investment marks the largest commitment by Microsoft in Denmark in its 36-year history in the country.

EXISTING VS. UPCOMING DATA CENTERS

  1. Existing Facilities in the region (Area and Power Capacity)
  2. Copenhagen
  3. Other Cities
  4. List of Upcoming Facilities in the region (Area and Power Capacity)
  5. Copenhagen
  6. Other Cities

REPORT COVERAGE:

This report analyses the Denmark data center market share. It elaborately analyses the existing and upcoming facilities and investments in IT, electrical, mechanical infrastructure, cooling systems, general construction, and tier standards. It discusses market sizing and investment estimation for different segments. The segmentation includes:

  1. IT Infrastructure
  2. Server Infrastructure
  3. Storage Infrastructure
  4. Network Infrastructure
  5. Electrical Infrastructure
  6. UPS Systems
  7. Generators
  8. Transfer Switches & Switchgears
  9. PDUs
  10. Other Electrical Infrastructure
  11. Mechanical Infrastructure
  12. Cooling Systems
  13. Rack Cabinets
  14. Other Mechanical Infrastructure
  15. Cooling Systems
  16. CRAC and CRAH
  17. Chillers
  18. Cooling Towers, Condensers and Dry Coolers
  19. Other Cooling Units
  20. General Construction
  21. Core & Shell Development
  22. Installation & Commissioning Services
  23. Building & Engineering Design
  24. Fire Detection & Suppression Systems
  25. Physical Security
  26. Data Center Infrastructure Management (DCIM)
  27. Tier Standard
  28. Tier I & Tier II
  29. Tier III
  30. Tier IV

DATA CENTER PROVIDERS/INVESTORS IN DENMARK

  1. IT INFRASTRUCTURE PROVIDERS: Arista Networks, Atos, Broadcom, Cisco, Dell Technologies, Hewlett Packard Enterprise, Huawei Technologies, IBM, Lenovo, NetApp and NVIDIA
  2. DATA CENTER CONSTRUCTION CONTRACTORS & SUB-CONTRACTORS: Arup, Averion, Collen Construction, Chromatic AB, COWI, CTS Group, Dornan, EIDA Solutions, Exited, Gottlieb Paludan Architects, John Sisk & Son, Logi-Tek, LPI Group, Mace, Mercury, MT Højgaard Danmark, NG Metal, NS Nordic AS, Per Aarsleff A/S, Ramboll, Rider Levett Bucknall (RLB), Søren Jensen and TSV Construction LLC
  3. SUPPORT INFRASTRUCTURE PROVIDERS: 3M, ABB, Aggreko, Alfa Laval, Saitek, Baudouin, Belimo, Carrier, Caterpillar, Clavinet, Cummins, Cyber Power Systems, Danfoss, DEIF, Delta Electronics, Eaton, GE Vernona, Grundfos, Hitachi Energy, HITEC Power Protection, Honeywell, Johnson Controls, Legrand, Mitsubishi Electric, Munters, NOVENCO Building & Industry, Power Innovations International, Rehlko, Riello Electronica Group, Rittal, Rolls Royce, Saft, Schneider Electric, Siemens, Sockmen Group, STULZ, System air Group, Toshiba Corporation, Uncool International and Vertiv.
  4. DATA CENTER INVESTORS: Apple, Atlas Edge, Bulk Infrastructure, Cabico A/S, Digital Realty, Global Connect, Google, JN Data, Kolo DC, Meta, Microsoft, Telia Group and Valtice Data Centers
  5. NEW ENTRANTS: at North, ECO-Location, Edora, GARBE Data Centers, Prime Data Centers and Thylander

RESEARCH METHODOLOGY

  1. Primary Research: Interviews/interactions with data center developers, colocation providers, contractors, system integrators, and infrastructure providers.
  2. Secondary Research: Analysis of annual reports, financial filings, press releases, data sheets, white papers, industry blogs, and tender documents.
  3. Historical Period: 2022–2024
  4. Base Year: 2025
  5. Forecast Period: 2026–2031
  6. Approach: Market data is validated using primary industry inputs and secondary sources, with 2025 representing actual values and 2026–2031 representing forecast estimates.

MARKET DEFINITIONS

  1. Investment — total capital deployed across IT, electrical, mechanical, and general construction infrastructure for a data center facility, measured in USD.
  2. Area (White Floor Space) — the usable raised-floor area allocated to IT equipment within a facility, measured in square feet.
  3. Power Capacity — the total IT load a facility is designed to support, measured in megawatts (MW).
  4. Tier Standard — the Uptime Institute classification (Tier I–IV) describing a facility's redundancy and fault tolerance.
  5. Colocation Type — retail colocation serves tenants requiring smaller rack or cage footprints; wholesale colocation serves tenants leasing dedicated suites or halls.

SNAPSHOT

The Denmark data center market size is projected to reach USD 3.19 billion by 2031, growing at a CAGR of 8.52% from 2025 to 2031.

The following factors are likely to contribute to the growth of the Denmark data center market during the forecast period:

  1. Growth in Cloud-based Services
  2. AI & ML Workloads and Government Support & Digital Economy Push
  3. Innovation in Technology and Liquid Cooling

Base Year: 2025

Forecast Year: 2026-2031

The report considers the present scenario of the Denmark data center market and its market dynamics for 2026-2031. It covers a detailed overview of several market growth enablers, restraints, and trends. The study includes the demand and supply aspects of the market.

This report also analyses the Denmark data center market share. It elaborately analyses the existing and upcoming facilities and investments in IT, electrical, mechanical infrastructure, general construction, and tier standards. It discusses market sizing and investment estimation for different segments.

The segmentation includes:

  1. IT Infrastructure
  2. Servers
  3. Storage Systems
  4. Network Infrastructure
  5. Electrical Infrastructure
  6. UPS Systems
  7. Generators
  8. Transfer Switches & Switchgears
  9. PDUs
  10. Other Electrical Infrastructure
  11. Mechanical Infrastructure
  12. Cooling Systems
  13. Rack Cabinets
  14. Other Mechanical Infrastructure
  15. Cooling Systems
  16. CRAC & CRAH Units
  17. Chiller Units
  18. Cooling Towers, Condensers & Dry Coolers
  19. Other Cooling Units
  20. General Construction
  21. Core & Shell Development
  22. Installation & Commissioning Services
  23. Engineering & Building Design
  24. Fire Detection & Suppression Systems
  25. Physical Security
  26. Data Center Infrastructure Management (DCIM)
  27. Tier Standard
  28. Tier I & Tier II
  29. Tier III
  30. Tier IV

VENDOR LANDSCAPE

IT Infrastructure Providers

  1. Arista Networks
  2. Atos
  3. Broadcom
  4. Cisco
  5. Dell Technologies
  6. Hewlett Packard Enterprise
  7. Huawei Technologies
  8. IBM
  9. Lenovo
  10. NetApp
  11. NVIDIA

DATA CENTER CONSTRUCTION CONTRACTORS & SUB-CONTRACTORS

  1. Arup
  2. Caverion
  3. Collen Construction
  4. Coromatic AB
  5. COWI
  6. CTS Group
  7. Dornan
  8. EIDA Solutions
  9. Exyte
  10. Gottlieb Paludan Architects
  11. John Sisk & Son
  12. Logi-tek
  13. LPI Group
  14. Mace
  15. Mercury
  16. MT Højgaard Danmark
  17. NG Metal
  18. NS Nordic AS
  19. Per Aarsleff A/S
  20. Ramboll
  21. Rider Levett Bucknall (RLB)
  22. Søren Jensen
  23. TSV Construction LLC

Support Infrastructure Providers

  1. 3M
  2. ABB
  3. Aggreko
  4. Alfa Laval
  5. Asetek
  6. Baudouin
  7. Belimo
  8. Carrier
  9. Caterpillar
  10. Climaveneta
  11. Cummins
  12. Cyber Power Systems
  13. Danfoss
  14. DEIF
  15. Delta Electronics
  16. Eaton
  17. GE Vernova
  18. Grundfos
  19. Hitachi Energy
  20. HITEC Power Protection
  21. Honeywell
  22. Johnson Controls
  23. Legrand
  24. Mitsubishi Electric
  25. Munters
  26. NOVENCO Building & Industry
  27. Power Innovations International
  28. Rehlko
  29. Riello Elettronica Group
  30. Rittal
  31. Rolls Royce
  32. Saft
  33. Schneider Electric
  34. Siemens
  35. Socomec Group
  36. STULZ
  37. Systemair Group
  38. Toshiba Corporation
  39. UniCool International
  40. Vertiv

Data Center Investors

  1. Apple
  2. AtlasEdge
  3. Bulk Infrastructure
  4. Cibicom A/S
  5. Digital Realty
  6. GlobalConnect
  7. Google
  8. JN Data
  9. Kolo DC
  10. Meta
  11. Microsoft
  12. Telia Group
  13. Vaultica Data Centers

New Entrants

  1. atNorth
  2. ECO-LocaXion
  3. Edora
  4. GARBE Data Centers
  5. Prime Data Centers
  6. Thylander

DENMARK DATA CENTER MARKET FAQs

How big is the Denmark data center market?

The Denmark data center market will witness investments of USD 3.19 billion by 2031, growing at a CAGR of 8.52 % during 2025–2031.

How much MW of power capacity will be added across Denmark during 2026-2031?

About 506 MW of power capacity will be added across Denmark during 2026-2031.

What factors are driving the Denmark data center market?

The country’s excellent fiber connectivity, low latency, proximity to major European markets, the surge in adoption of advanced technologies like AI and ML, and rapid digitalization are among the factors driving growth in the data center market, attracting global data center operators and cloud providers.

For more details, please reach us at [email protected]

1. CHAPTER 1: EXISTING & UPCOMING THIRD-PARTY DATA CENTERS IN DENMARK

• Data Center Snapshot

• Data Center Snapshot By Cities

• Existing & Upcoming Data Center Supply

• List of Upcoming Data Center Projects in Denmark

2. CHAPTER 2: INVESTMENT OPPORTUNITIES IN DENMARK

• Microeconomic & Macroeconomic Factors for Denmark Market

• Impact of AI in Data Center Industry in Denmark

• Investment Opportunities in Denmark

• Factors Attracting Foreign Data Center Investments In Denmark

• National Strategy For Digitalization 2022-2026

• Digital Data in Denmark

• Government Rules & Regulations for Data Center

• Market Investment by Area

• Market Investment by Power Capacity

3. CHAPTER 3: DATA CENTER COLOCATION MARKET IN DENMARK

• Colocation Services Market in Denmark

• Retail Vs Wholesale Data Center Colocation

• Demand Across Several Industries in Denmark

• Industry Demand Share

• Colocation Pricing (Quarter Rack, Half Rack & Full Rack) & Add-ons

4. CHAPTER 4: MARKET DYNAMICS

• Market Enablers

• Market Trends

• Market Restraints

5. CHAPTER 5: MARKET SEGMENTATION

• IT Infrastructure: Market Size & Forecast

• Electrical Infrastructure: Market Size & Forecast

• Mechanical Infrastructure: Market Size & Forecast

• General Construction: Market Size & Forecast

6. CHAPTER 6: TIER STANDARDS INVESTMENT

• Tier I & II

• Tier III

• Tier IV

7. CHAPTER 7: KEY MARKET PARTICIPANTS

• IT Infrastructure Providers

• Construction Contractors & Sub-Contractors

• Support Infrastructure Providers

• Data Center Investors

• New Entrants

8. CHAPTER 8: APPENDIX

• Market Derivation

• Site Selection Criteria

• Quantitative Summary

Select a license type that suits your business needs

Single User Licence

$3500
  • Report accessible by one user only
  • Free 10% or 3 days of customization
  • Free post-sale service assistance
  • Continuous support through email

5 User Licence

$3650
  • Report accessible by 5 users within the organization
  • Free 15% or 4.5 days of customization
  • Continuous support through email and telephone
  • Free analyst hour
  • Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge

Corporate Licence

$4999
  • Free Datasheet worth $1500
  • Report accessible by the entire organization
  • Free 20% or 6 days of customization
  • Free post-sale service assistance
  • Continuous support through email and telephone
  • Direct access to lead analysts
  • Free analyst hour
  • Free Upgrade: If an updated report published within 180 days of purchase, you will get the revised report free of charge

Datasheet Licence

$2000
  • Report accessible by 1 user only
  • Free 15% or 32 hours of customization
  • Free post-sale service assistance
  • Direct access to lead analysts

Frequently Asked Questions

How big is the Denmark data center market?

The Denmark data center market will witness investments of USD 3.19 billion by 2031, growing at a CAGR of 8.52 % during 2025–2031.

How much MW of power capacity will be added across Denmark during 2026-2031?

About 506 MW of power capacity will be added across Denmark during 2026-2031.

What factors are driving the Denmark data center market?

The country’s excellent fiber connectivity, low latency, proximity to major European markets, the surge in adoption of advanced technologies like AI and ML, and rapid digitalization are among the factors driving growth in the data center market, attracting global data center operators and cloud providers.